✍️ 🧑‍🦱 💚 Autor:innen verdienen bei uns doppelt. Dank euch haben sie so schon 476.753 € mehr verdient. → Mehr erfahren 💪 📚 🙏

Comprehensive Project Risk Management

Comprehensive Project Risk Management

von Luis F. Copertari
Softcover - 9786202527132
46,90 €
  • Versandkostenfrei
Auf meine Merkliste
  • Hinweis: Print on Demand. Lieferbar in 2 Tagen.
  • Lieferzeit nach Versand: ca. 1-2 Tage
  • inkl. MwSt. & Versandkosten (innerhalb Deutschlands)

Autorenfreundlich Bücher kaufen?!

Beschreibung

This book is about a new methodology that integrates the three project management dimensions of interest: time, cost and return (performance). The methodology analyzes their tradeoffs and relationships from the point of view of their uncertainty (previously identified risks).This is possible because I model time, cost and return as a beta distribution, thanks to a breakthrough into a way to calculate beta-distributed range and shape parameters.The Probabilistic Critical Path Method (PCPM) combines the advantages of both CPM and PERT. A heuristic able to do what I call probabilistic crashing finds the relationships between time and cost and then between time/cost and return.A specially designed interface shows on a flat screen the probability of not exceeding the due date and the budget, as well as the probability of exceeding the Minimum Attractive Rate of Return (MARR) and interactively lets the user consider different possibilities for the project. Finally, it considers both direct and indirect costs and provides the optimal tradeoff based on any given indirect cost slope.

The Probabilistic Critical Path Method (PCPM)

Details

Verlag LAP LAMBERT Academic Publishing
Ersterscheinung 20. April 2020
Maße 22 cm x 15 cm x 1.1 cm
Gewicht 268 Gramm
Format Softcover
ISBN-13 9786202527132
Seiten 168