✍️ 🧑‍🦱 💚 Autor:innen verdienen bei uns doppelt. Dank euch haben sie so schon 431.453 € mehr verdient. → Mehr erfahren 💪 📚 🙏

Causes and Effects of Cost and Time Overrun

Causes and Effects of Cost and Time Overrun

von Mohammed Shakil Malek und Shambel G. Tadewos
Softcover - 9786138501299
59,90 €
  • Versandkostenfrei
Auf meine Merkliste
  • Hinweis: Print on Demand. Lieferbar in 5 Tagen.
  • Lieferzeit nach Versand: ca. 1-2 Tage
  • inkl. MwSt. & Versandkosten (innerhalb Deutschlands)

Autorenfreundlich Bücher kaufen?!

Beschreibung

A number of road construction projects are increasing from time to time in Gujarat, India. However, completion in predetermined cost and time is difficult. The objective of this book is to identify the factors causing cost and time overrun on road construction project in Gujarat and to give relevant recommendations to the most critical factors. This study is delimited incauses and effects of cost and time overrun of road construction projects in Gujarat. Questionnaire survey was used to collect the data from the contactors, clients and consultants and Relative Importance Index (RII) method adopted for analysis. Form the analysis four and eleven major factors are identified for cost and time overrun causes respectively. Spearman¿s rank coefficient was adopted to test the agreement to in ranking of the factors.There is a strong correlation in ranking between the Consultant Vs Client (Gov¿t body) for the factors affecting cost overruns and Contractor Vs Client (Gov¿t body) for factors affecting time overruns. Findingsof the study will help designers, clients, and contractors to aware and improve of cost and time overrun in road constructions in the future.

of Road Construction Projects in Gujarat

Details

Verlag Scholars' Press
Ersterscheinung 07. Dezember 2018
Maße 22 cm x 15 cm x 0.6 cm
Gewicht 161 Gramm
Format Softcover
ISBN-13 9786138501299
Seiten 96

Widerrufsantrag einreichen

Füllen Sie das folgende Formular aus, um Ihren Widerrufsantrag einzureichen.