✍️ 🧑‍🦱 💚 Autor:innen verdienen bei uns doppelt. Dank euch haben sie so schon 418.243 € mehr verdient. → Mehr erfahren 💪 📚 🙏

Time, cost and floor Area relationship

Time, cost and floor Area relationship

von Muluken Tilahun
Softcover - 9783846598566
49,00 €
  • Versandkostenfrei
Auf meine Merkliste
  • Hinweis: Print on Demand. Lieferbar in 5 Tagen.
  • Lieferzeit nach Versand: ca. 1-2 Tage
  • inkl. MwSt. & Versandkosten (innerhalb Deutschlands)

Autorenfreundlich Bücher kaufen?!

Beschreibung

Time and cost are the two most important constraints among the four project constraints which are time,cost,quality and safety in project management. In this desertation I have addressed two of the above constraints and it is very interesting issues for project stakeholders in construction and other projects. This desertation has shown the relation ship between time and cost and a model is developed to predict construction time knowing project cost.Further more,this work has shown that there is a direct relationship between Construction cost and building total floor area and a model is develped to predict cost knowing the total floor area of the building from preliminary design. The desertaion can be used as asource document for further study.Similarly the desertation has reviewed different publications which are written in the area.

for Educational building projects in Ethiopia

Details

Verlag LAP LAMBERT Academic Publishing
Ersterscheinung 17. Januar 2012
Maße 22 cm x 15 cm x 0.8 cm
Gewicht 197 Gramm
Format Softcover
ISBN-13 9783846598566
Seiten 120