✍️ 🧑‍🦱 💚 Autor:innen verdienen bei uns doppelt. Dank euch haben sie so schon 476.753 € mehr verdient. → Mehr erfahren 💪 📚 🙏

Factors Affecting Delays of Cost Overrun in Building Construction

Factors Affecting Delays of Cost Overrun in Building Construction

von Mansi Goswami
Softcover - 9786200483164
39,90 €
  • Versandkostenfrei
Auf meine Merkliste
  • Hinweis: Print on Demand. Lieferbar in 2 Tagen.
  • Lieferzeit nach Versand: ca. 1-2 Tage
  • inkl. MwSt. & Versandkosten (innerhalb Deutschlands)

Autorenfreundlich Bücher kaufen?!

Beschreibung

The construction housing project is most likely to have the construction time delay and the construction time delay is the biggest problem for the construction industries. Most projects have delays due to the same reasons, such as shortage of the materials, shortage of the labor, poor supervising and many more. As indicated by this investigation, the customer related elements are the significant elements responsible for the postponement of the development venture. The customer related postponements are poor correspondence and cooperation, delay in advance of installments, late in modifying, suspension of work by proprietor, gradualness in basic leadership process and change arranges by proprietors amid the development. These factors mostly contribute to the postponement in the building venture and delivery of building projects thus not respecting the set deadline. In this work, the real reasons for the development deferrals are investigated and the final results are studied by fuzzy method according to the replies of the respondents (site engineer, supervisor, project manager, academic person).

A Study of Causes of Construction Time Delay

Details

Verlag LAP LAMBERT Academic Publishing
Ersterscheinung 23. Dezember 2019
Maße 22 cm x 15 cm x 0.4 cm
Gewicht 96 Gramm
Format Softcover
ISBN-13 9786200483164
Seiten 52