✍️ 🧑‍🦱 💚 Autor:innen verdienen bei uns doppelt. Dank euch haben sie so schon 476.753 € mehr verdient. → Mehr erfahren 💪 📚 🙏

Communication Protocols, Queuing and Scheduling Delay Analysis

Communication Protocols, Queuing and Scheduling Delay Analysis

von Fayyaz Ahmed
Softcover - 9783659824203
71,90 €
  • Versandkostenfrei
Auf meine Merkliste
  • Hinweis: Print on Demand. Lieferbar in 2 Tagen.
  • Lieferzeit nach Versand: ca. 1-2 Tage
  • inkl. MwSt. & Versandkosten (innerhalb Deutschlands)

Autorenfreundlich Bücher kaufen?!

Beschreibung

Industrial dynamical, Networked Control Systems (NCSs) are controlled over a communication network. We study a continuous-time CANada Deuterium Uranium-Super Critical Water Reactor (CANDU-SCWR) hydrogen plant and a discrete-time controller, sensor and actuator block, that are connected via a communication network, such as e.g. controller area network (CAN), Ethernet or wireless networks. Issues associated with NCSs are time-varying delays, timevarying sampling intervals and loss of data due to packet drop outs. Delays are also associated with software chosen, control system architecture and computation load. CANDU-SCWR hydrogen co-generation model reliability can be analyzed by dynamic flow graph methodology. We have analyzed the CANDU-SCWR feed water integration with the oxygen unit of copper chloride cycle and also conducted an analytical review of the current networked control system delays.

in CANDU SCWR Hydrogen Co-generation Model

Details

Verlag LAP LAMBERT Academic Publishing
Ersterscheinung 14. November 2018
Maße 22 cm x 15 cm x 1.1 cm
Gewicht 268 Gramm
Format Softcover
ISBN-13 9783659824203
Seiten 168