{"product_id":"designing-the-splitting-of-a-road-section-cw46-over-5km-von-haroune-benmalek-und-riad-babba","title":"Designing the splitting of a road section (CW46) over 5km","description":"\u003cp\u003eOur project concerns the splitting of the CW46 between Sidi Maarouf and Hassi Bounif in the wilaya of Oran, it begins at pk 00+0000m and ends at pk 05+356 m, this section to be studied extends over a length of 5,356 km and vehicle a significant average daily traffic estimated at around 9000v\/d.The route consists of maintaining the existing roadway as much as possible and doubling it:¿ The percentage of heavy goods vehicles is 25%, according to a last count carried out in 2014.¿ The project route is located in a flat terrain, and is characterized by medium windings (E2), and medium gradients. It is classified in category (C2) and the base speed of the project is estimated at 80 km\/h.The road runs parallel to the railway, buildings, agricultural land as well as crossing with ring road 2 from PK 4+221.645 m to PK 4+267.207 m. They are considered as constraints which pose a difficulty.It is connected to several towns and villages such as Sidi Chahmi and Sidi Okba Zaouïa Bel Kaidiä also it is used as a link between these towns and villages with the city center of Oran.\u003c\/p\u003e\u003cdiv class=\"aw-variant-hidden-subtitle-div\" id=\"aw-variant-subtitle-9786206843573\"\u003e\u003ch3\u003e\u003c\/h3\u003e\u003c\/div\u003e","brand":"Autorenwelt Shop","offers":[{"title":"Softcover - 9786206843573","offer_id":48250898776389,"sku":"9786206843573","price":84.9,"currency_code":"EUR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0940\/0622\/files\/d09ec022-0945-4b2f-9933-b0ba6c4ea69f.png?v=1759122039","url":"https:\/\/shop.autorenwelt.de\/products\/designing-the-splitting-of-a-road-section-cw46-over-5km-von-haroune-benmalek-und-riad-babba","provider":"Autorenwelt Shop","version":"1.0","type":"link"}