{"product_id":"communication-protocols-queuing-and-scheduling-delay-analysis-in-candu-scwr-hydrogen-co-generation-model-von-fayyaz-ahmed","title":"Communication Protocols, Queuing and Scheduling Delay Analysis","description":"\u003cp\u003eIndustrial dynamical, Networked Control Systems (NCSs) are controlled over a communication network. We study a continuous-time CANada Deuterium Uranium-Super Critical Water Reactor (CANDU-SCWR) hydrogen plant and a discrete-time controller, sensor and actuator block, that are connected via a communication network, such as e.g. controller area network (CAN), Ethernet or wireless networks. Issues associated with NCSs are time-varying delays, timevarying sampling intervals and loss of data due to packet drop outs. Delays are also associated with software chosen, control system architecture and computation load. CANDU-SCWR hydrogen co-generation model reliability can be analyzed by dynamic flow graph methodology. We have analyzed the CANDU-SCWR feed water integration with the oxygen unit of copper chloride cycle and also conducted an analytical review of the current networked control system delays.\u003c\/p\u003e\u003cdiv class=\"aw-variant-hidden-subtitle-div\" id=\"aw-variant-subtitle-9783659824203\"\u003e\u003ch3\u003ein CANDU SCWR Hydrogen Co-generation Model\u003c\/h3\u003e\u003c\/div\u003e","brand":"Libri","offers":[{"title":"Softcover - 9783659824203","offer_id":39450173407325,"sku":"9783659824203","price":71.9,"currency_code":"EUR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0940\/0622\/files\/8518e2bf-a4f3-4732-9506-73f3e122a536.jpg?v=1776231664","url":"https:\/\/shop.autorenwelt.de\/en\/products\/communication-protocols-queuing-and-scheduling-delay-analysis-in-candu-scwr-hydrogen-co-generation-model-von-fayyaz-ahmed","provider":"Autorenwelt Shop","version":"1.0","type":"link"}